Oct. 12: This is actually my second post for today.... the first was dropped with loss of wifi.. Sigh. Winter is definitely here; lots of rain and cold, but the weekend was perfect none the less with the arrival of Sean and Chris for Thanksgiving. We feasted, and crawled through the build. The rooms over the garage are taking shape with completion of the second level sub flooring. Scaffolding has appeared onsite, as Trevor prepares to frame the over- height walls of the great room.
View from the ocean side - the orange fencing is 'protecting' our delicate Douglas Fir tree.
Garage and view of the I Beams which will hold the second level sub flooring.
Framing on the second level (laundry room and hall way).
Chris likes the 10 foot ceilings!
Analyzing the human factors and air flow within the build- love the input from Sean!