Garage Framing....

Oct. 17: Over the last two days, the crew has been concentrating on framing the garage, the rooms above  and the hallway the joins the garage to the main part of the house. This area has a lot of different levels of both floor and roof - a challenge for me to visualize, but not a challenge for Trevor et al to construct. The subflooring is completed, even on the raised patio, and the South and West walls are up. The slant in the roof line is obvious. In the second floor hallway ( towards the garage rooms) the windows are framed in to be level with the windows that will be above the front door. Speaking of the front door - well we don't have one yet cuz I can't make up my mind on the glazing..... We should have windows and the other exterior doors by the end of November. I suppose we could just use a sheet of plywood out front... classy. 

The Workshop side of the garage

The Workshop side of the garage

On the second level looking towards the rooms over the garage and the slanted roof.

On the second level looking towards the rooms over the garage and the slanted roof.

South & West walls (above the garage) The East wall is assembled on the floor. Love this space!

South & West walls (above the garage) The East wall is assembled on the floor. Love this space!