Sept. 23: The concrete mass is starting to look like a house with the installation of the subfloor. Trevor, the one man carpenter show, is busy measuring, placing brackets, sizing the massive I Beams and sliding them into place. Sounds simple? - He does get some help with the heavy lifting - amazing process. After the I Beams are in place, the tongue-in-grove flooring sheets are sized, tapped into place, glued and screwed down. Walking the floor there is no movement or noise! (I assume that is the purpose of this multi-stage process).
I Beams in place, ready for floor installation.