Oct. 31: The sun has just peaked out and the rain has stopped in time for ghosts and goblins to trek about the neighbourhoods. Hopefully this means the house will have a chance to dry out a bit... still have small lakes in the framed rooms upstairs and down. There is now temporary stairs to to the rooms above the garage... put in only after I mastered the 2 X 12 lumber walk... ( not as bad as the 11 foot ladder climb). This allows me safe access throughout the build. The concentration this week has been on setting the roof joists, and putting sheets of wood up in preparation for the "roofing" next week. It is cool to see (and understand) how the slanted and flat roofs interface "up top". Inside, the covered roof gives more definition to the spaces. I can now imagine what the completed rooms will be...
Last of the open roof, above the upper hallway and laundry room.
The slanted roof (from the garage) meets the flat roof, above the den and bedrooms
Major puddles ....
Sis - you must come back; with these stairs we can negotiate the entire house!