Hydro Intallation

Nov. 10: Before the rain started this week, before the city paved the road and after a 3 month wait, BC Hydro finally came out and dug the trench across the road to bring electrical service to our lot. That was the good news, the bad news came with the estimated cost for the hook-up. I am not a fan of utility monopolies..... The city of Sidney has installed water and sewer, while we are waiting on the gas company to do their thing. All in, the other utilities costs are less than one third of hydro's..... just saying. 

Trench going in before the road is paved.

Trench going in before the road is paved.