Partial Roof

Nov. 12: We have a partial roof - I am amazed the crew has got so much done on the roof, despite the constant rain - they took a break today as it was a windy downpour. Inside, the carpenters were framing interior walls, and the outside wall beside the back stairs. The front door & side lite windows are also now framed, as is the space under the back stairs that will have a small 'powder room - breath in! I crawled out onto the den roof (also the roof over the front entrance) to see the completed roofing over the front entry and the great room and bedrooms. 

Front door framed... it is 8' tall!

Front door framed... it is 8' tall!

The back stairs - the dark part on the right will be the 2 piece bathroom.

The back stairs - the dark part on the right will be the 2 piece bathroom.

Completed flat roof over the front entry

Completed flat roof over the front entry

Flat roof over the great room

Flat roof over the great room