Exterior Progress

Jan. 13: The team is very busy outside as well as in. As noted in an earlier blog, the carpenters have begun strapping the outside of the walls, in preparation for the cedar siding. Additionally, a single window has been trimmed in cedar stained the colour of the siding. It is exciting to get a glimpse of how the house will look and eventually settle into the surrounding environment.  It was a sunny day today on Roberts Bay. The tides are unusually high - very spectacular. 

Cedar window trim in the colour all the siding and trim will be stained.

Cedar window trim in the colour all the siding and trim will be stained.

The back (East) door that demonstrates the window casing and trim along with the matching door colour. Can also see the exterior wall preparation for the siding and the foundation seal. 

The back (East) door that demonstrates the window casing and trim along with the matching door colour. Can also see the exterior wall preparation for the siding and the foundation seal. 

The West wall prepared for window trimming and siding. Note the new scaffolding system - very cool.

The West wall prepared for window trimming and siding. Note the new scaffolding system - very cool.