Jan. 20: The team is now focused on details within the build - details that will provide the polished look to our home.

Completed plumbing pipe placement from the Master ensuite.

Completed plumbing pipe placement from the Master ensuite.

Framing for the concrete/wood pillar on the SouthEast corner of the covered patio.

Framing for the concrete/wood pillar on the SouthEast corner of the covered patio.

All the windows are framed with individually crafted cedar slats - I am loving the colour.

All the windows are framed with individually crafted cedar slats - I am loving the colour.

base for fireplace framing in the sitting room. It is only 11" deep - awesome.

base for fireplace framing in the sitting room. It is only 11" deep - awesome.

Reinforcing the stairwell for handrail installation in the future. 

Reinforcing the stairwell for handrail installation in the future.