More plumbing details (and heating / ac / venting / gas....etc.)

Feb. 4: I am amazed at the progress this week. Most noticeably, lots of new mechanical stuff. The gas fitter has plumbed in for the fireplaces, range and dryer. A/C and associated venting has been run through the crawl space, and vented to the great room and master bedroom on the second floor. Plumbing rough in has included access to kitchen appliances (steam oven, coffee maker, refrigerator, freezer), laundry and sinks. Next week, the in-floor heating is due to be installed..... 

The holding tank is 'dug in'  to the mechanical room floor with the appropriate piping attached. . 

The holding tank is 'dug in'  to the mechanical room floor with the appropriate piping attached. . 

The copper gas pipes...

The copper gas pipes...

Copper gas pipe to the main laundry for the gas dryer.

Copper gas pipe to the main laundry for the gas dryer.

Both the water and gas shut off valves are brought to the front of the pedestal for ease of access.

Both the water and gas shut off valves are brought to the front of the pedestal for ease of access.

Gas line for the fireplace in the sitting room above the garage.

Gas line for the fireplace in the sitting room above the garage.

And here is one of the fireplaces!!

And here is one of the fireplaces!!

Termination of the ventilation recovery system (that is in each bedroom..) 

Termination of the ventilation recovery system (that is in each bedroom..) 

Exhaust to the outside for the ventilation system.

Exhaust to the outside for the ventilation system.

The A/C unit that will provide cool air to the kitchen and great room area....

The A/C unit that will provide cool air to the kitchen and great room area....

A/C unit that will pump cool air to the master bedroom area.

A/C unit that will pump cool air to the master bedroom area.

A/C venting beside the great room fireplace...

A/C venting beside the great room fireplace...