Feb. 5: More framing details are in place as Ian and the team completes the bones of the house. The main fireplace, with its revised proportions, is now roughed in, along with the fireplaces in the master bedroom and sitting room.
Framing for the great room fireplace, hearth and chimney.
Fireplace opening and the hearth area that will house the media cabinet.
The other side of the fireplace, and the floating hearth.
A/C duct outlet under the floating hearth
A/C outlet outlet on the other side of the floating hearth.
Floor level outlets for A/C - these will be part of the island... You can see the electrical and plumbing rough in for the services on the island.
Master bedroom fireplace framing and fireplace in a box beside the frame!!!
completed laundry machine pedestal in the main laundry... second floor.
Okay - not a framing detail but the electrical sub panel in the pantry does seem to have a life of it's own....