May 14: It is Saturday today and I love going through the house on Saturday as most trades are not there and I can really see the build's progress. CJ (cabinet installer) and David (mason) were both working today. Their dedication to my home is touching.....
The cabinet beside the fireplace installed - almost
The cabinet edge is flush to the lower part of the mantel, allowing the doors to open and slide back into place.
Other side of the cabinet - the unit will be flush to the tile surrounding the fireplace.
Media Cabinet doors.
Media cabinet installed beside fireplace.
Rockwall progress today....
The glass cabinet doors on one end of the island.... so cool.
Edge grain firm framing and trim surrounding the dining room nana wall.
Frame & trim detail.
Trim completed on the den windows.
Sink used for all bathrooms
Ensuite shower
Niche in the ensuite shower
The door is installed between the ensuite and the walk in closet. This door will be paneled in the same teak veneer that the vanities are made from.
Floor tiles with grout in the den bathroom
Dog / utility shower with white grout
Electrical sub panel installed in the pantry.
... And one in the guest rooms above the garage.
Exciting!! Installation of the wood floor starts next week. There is only one type of hardwood floor throughout the house - that means lots of wood; so half is here......
And the rest is upstairs where the work will start.