May 8: More progress on both the cabinet and tile installation. I have had discussions about the height of shower 'niche' (What would be the plural for those??) and consultations about the placement of the kitchen island... to be honest I was worried the island was not placed properly - that it was not relating to the ceiling lighting well. But I have been reassured all is good - thanks Lorin. This makes CJ happy, as moving the thing 1 or 2 inches would be a huge deal!!! The house designer, Russ Collins, visited the project today - it was so cool to show him how our collective vision is turning out; He seems pleased.