Feb. 24: As I walk around the house I see new details in many different areas.
The mechanical room has a permanent door
The holding tank is held in place within the concrete floor of the mechanical room
The gas fittings organized on paper board which will line the walls of the mechanical room.
Lots happening on the garage exterior. The knee brace (cedar struts) have been painted. The soffits are being lined with smooth cedar panels and the garage door opening is framed with thicker planks of cedar.
The soffit and casement windows over the front door, both clad in cedar.
Multi leveled roofs at the front entrance.
Construction of the drop ceiling in our walk in closet.
Frames for the three pocket doors....