More details this week

Feb. 24: As I walk around the house I see new details in many different areas. 

The mechanical room has a permanent door

The mechanical room has a permanent door

The holding tank is held in place within the concrete floor of the mechanical room

The holding tank is held in place within the concrete floor of the mechanical room

The gas fittings organized on paper board which will line the walls of the mechanical room.

The gas fittings organized on paper board which will line the walls of the mechanical room.

Lots happening on the garage exterior. The knee brace (cedar struts) have been painted. The soffits are being lined with smooth cedar panels and the garage door opening is framed with thicker planks of cedar. 

Lots happening on the garage exterior. The knee brace (cedar struts) have been painted. The soffits are being lined with smooth cedar panels and the garage door opening is framed with thicker planks of cedar. 

The soffit and casement windows over the front door, both clad in cedar.

The soffit and casement windows over the front door, both clad in cedar.

Multi leveled roofs at the front entrance.

Multi leveled roofs at the front entrance.

Construction of the drop ceiling in our walk in closet.

Construction of the drop ceiling in our walk in closet.

Frames for the three pocket doors....

Frames for the three pocket doors....

Sunset on Roberts Bay.

Sunset on Roberts Bay.