Hardscape preparation

March 15: Along with all the action happening inside the house, there is lots going on outside as well. A couple of small earth moving machines (miniature ones really), have been brought in to start leveling off the yard in preparation for the landscaping. 

The utilities are installed along the East side yard up to the access point at the North East of the lot. 

The utilities are installed along the East side yard up to the access point at the North East of the lot. 

BC Hydro digging up the road to connect up our house.

BC Hydro digging up the road to connect up our house.

Backfill and leveling of the East side yard.

Backfill and leveling of the East side yard.

Another smaller earth mover working to level out the yard. 

Another smaller earth mover working to level out the yard. 

Working around the tree that was felled prior to construction. We hope the tree will be outdoor furniture one day.....

Working around the tree that was felled prior to construction. We hope the tree will be outdoor furniture one day.....

Leveling out for the driveways.

Leveling out for the driveways.