March 14: The insulation process has started, and should take about a week. There are several products being used in the house; a fiberglass product on the exterior walls, and a wool product on the interior walls that work as both insulation and sound barrier. Spray insulation will be used in the roofs, and of course there was already foam core sheet insulation on the exterior of the roof. Actually the list of individual products used throughout the build is extensive - our contractor is very detail orientated. Also, the rough in (I believe) is finally completed - the toilets have been roughed in, and the back staircase complete.
Insulation with a fiberglass product on the exterior walls
Insulating in the great room
Rough in for the wall hung toilets
Galvanized steel pan for under the washer and dryer. A water sensor will be placed here to monitor for leaks - part of the home automation system. Very cool.
Completed back stairs......