May 25: it has been a short week, but there is progress in several areas. CJ has clad the pillar in the great room and completed a number of details in several areas of the house. Pete has installed many of the recessed lights throughout the house. Paul has trimed several windows on the lower level. And the siding continues to crawl up the East wall.....