May 25th: The studio, hallway, walk-in closet and master bedroom have had flooring installed over the last two days. This floor was installed slightly different that the other part of the second floor. It was installed over a 'paper' like wrap, to prevent movement and noise. The individual panels were glued together and then stabled down to the sub floor. The lower level will have flooring in a week or so, but that will be fully glued down (can't stable into cement). I am very happy with the flooring ..... good thing.