A month of Details missed....

July 18: So much happened in the house build while away... as expected. Interior doors (and door handles) installed, exterior doors removed, some appliances in (and functioning) and most of the plumbing fixtures in place. Siding has been completed on three sides of the house, and the exoskeleton removed (no more scaffolding). The same day the counters were installed, the fireplace in the great room was finished - a wonderful design statement.... Thanks Lorin.

Interior door between the front entry and the mud room. 

Interior door between the front entry and the mud room. 

French doors with the handles on... and the protective paper on the glass. Sigh

French doors with the handles on... and the protective paper on the glass. Sigh

Closet and bathroom door in the den... the glass door is a pocket door....

Closet and bathroom door in the den... the glass door is a pocket door....

The front door was in, and now removed for rehabilitation.... Sigh

The front door was in, and now removed for rehabilitation.... Sigh

Door to the powder room under the stairs.....

Door to the powder room under the stairs.....

Small powder room... What else do we need as we rush in from the garage???

Small powder room... What else do we need as we rush in from the garage???

Bosch Laundry installed in the mud room... 

Bosch Laundry installed in the mud room... 

Freezer in the pantry.... finally.

Freezer in the pantry.... finally.

East side of the house with completed siding and no scaffolding!!

East side of the house with completed siding and no scaffolding!!

Ocean side of the house.... again, no scaffolding. The concrete cap for the pillar is framed, to be poured next week.

Ocean side of the house.... again, no scaffolding. The concrete cap for the pillar is framed, to be poured next week.

Fireplace stone installation completed.....did I say love the design? 

Fireplace stone installation completed.....did I say love the design?